Construction design and control problem of Jong-span bridge structures become more and more important in engineering with the Widely use of the structures. In this paper the computational structural mechanics is introduced to solve the problem,and the computational method to determine the structural condition after completion and ideal condition at each construction stage is presented. The programming principle and procesure is also given in this paper.